Risk assessment
Collect the site, work activities, hazards, people affected, existing arrangements and questions for competent review.
Download free risk assessment worksheet (CSV)
HazardDocs · England
Prepare both parts of your RAMS: the risk assessment and the method statement. Use the blank worksheets to collect job details, hazards, proposed arrangements and work-sequence questions, then compare the illustrative PDF formats.
Opens a free CSV in Excel or another spreadsheet. No registration required.
Collect the site, work activities, hazards, people affected, existing arrangements and questions for competent review.
Download free risk assessment worksheet (CSV)
Gather the job scope, responsibilities, equipment, work phases and checks for a site-specific method statement.
Download free method statement worksheet (CSV)
These are preparation aids and illustrative samples, not approved RAMS or instructions for carrying out the work. A competent person must verify the actual site, work sequence, hazards, controls and authorisations before issue. Do not copy example risk scores or assume the sample arrangements apply to your job.
Turn the details of your construction, cleaning, maintenance or other workplace task into a coordinated risk assessment and method statement draft. HazardDocs asks about the work, site conditions and controls, then helps you prepare documents you can edit and review before issue.
Your job → editable AI draft → your review → PDF
RAMS brings together two linked documents. The risk assessment records what could cause harm, who may be affected and the controls needed. The method statement describes the work sequence and how those controls will be put into practice. HazardDocs can draft both using the same saved job details, so the work description, site and activities start from a consistent set of answers. Select the relevant document types in the builder.
A useful starting brief identifies the rooms, working hours, equipment, access arrangements and other people using the premises. The assessment should address the hazards actually present; the work sequence should identify how the contractor will verify isolation, manage access and hand the installation back. This is an example of the information to supply, not an electrical isolation procedure or a complete assessment. The competent reviewer must confirm the real arrangements.
Sign in, create a job and select a risk assessment and method statement. Answer the relevant questions, subscribe and generate the drafts. Review and edit both against the site and client requirements; record the competent reviewer before issuing.
One £14.99 monthly subscription includes all supported documents for normal business use, VAT included. Cancel anytime. The England service is not a claim of coverage for Scotland, Wales or Northern Ireland. A RAMS pack does not replace a required construction phase plan, specialist assessments or principal contractor coordination.
Reference: HSE construction administration. Independent software; no regulator endorsement.