Electrical work in an occupied shop, a new installation and maintenance on existing machinery should not begin from an identical description. The task boundaries, equipment, other users and coordination arrangements change. Your RAMS should make those differences clear.
The £14.99 monthly subscription includes all supported document types for normal use by one business. Prepare a risk assessment and method statement from the same saved job details. Cancel anytime.
Example brief: replacing lighting in an occupied premises
An illustrative job brief identifies the rooms and fittings included, when work is planned, whether other people remain on the premises, the proposed access equipment and who agrees the work area with the customer. It also records which electrical and building information has actually been confirmed.
The example is a description of useful input. It is not an isolation, testing or work-at-height procedure. Those arrangements must be defined and verified by people competent for the actual installation and task. The generator cannot establish them from a short description.
| Job detail | What the draft needs to distinguish |
|---|---|
| Installation and scope | What equipment is included and excluded. |
| Occupancy and interfaces | Who else uses the premises during the work. |
| Electrical information | What is known and what still needs verification. |
| Tools and access | What is actually proposed for this site. |
| Coordination and permissions | Who confirms the agreed work arrangements. |
| Checks and handover | What the responsible people need to confirm before issue. |
Keep the risk assessment and work sequence consistent
The assessment and method statement should describe the same scope, location and revision. A control recorded in the assessment should not conflict with the proposed work sequence. Where a detail is unconfirmed, the draft should leave a clear question for the reviewer rather than assume that permission, isolation or access exists.
HSE’s guidance on work on electrical equipment stresses planning and preparation. Use the source below alongside the information for the actual installation. HazardDocs can organise the paperwork; it cannot check an installation or authorise electrical work.
Installation, maintenance and construction context
Describe the nature of the electrical activity and its relationship with the wider job. Electrical work can arise within different project and workplace arrangements. Calling the job maintenance does not, by itself, establish which responsibilities apply.
Provide the relevant client requirements and available site information. A RAMS pack is a task-level document set; it should not be treated as completing every wider project plan, permit, specialist assessment, inspection or electrical certification requirement.
From job questions to reviewed PDFs
Create the customer and job and select risk assessment and method statement. Add the site, work scope and equipment, then answer the relevant questions. Complete checkout before AI generation.
Check both drafts against the actual arrangements, edit inaccurate assumptions and record the reviewer through Review & approve before issue. If the work changes, return to the saved job, revise the affected information and review the documents again. The review belongs to the people responsible for the work.
Common questions
Does the job pack automatically certify the work?
No. It creates editable document drafts. Competence, site checks, permissions, electrical certification and the suitability of the work arrangements remain separate matters.
Can I prepare electrical maintenance RAMS?
Describe the maintenance task, installation and workplace context in the job brief. The draft must be reviewed for that particular work and should not assume that every maintenance activity has the same requirements.
Can I create only the method statement?
Yes. The monthly subscription includes both document types. Select the document you need and review it before issue.
Sources for the preparation guide
These sources provide context. They do not endorse HazardDocs or approve the example brief.