Electrical RAMS that start with the actual work.

Free risk assessment preparation worksheet and sample PDF

Collect the site, work activities, hazards, people affected, existing arrangements and questions for competent review.

Download free risk assessment worksheet (CSV)

Opens a free CSV in Excel or another spreadsheet. No registration required.

Preview the example risk assessmentPreview the example risk assessment

Illustrative sample only. Not for site use.

View example risk assessment PDF

Blank preparation aid only. Do not copy example risk scores or control measures into a live assessment. A competent person must check the real work and site conditions before issue.

Create your own risk assessment

Create linked risk assessment and method statement drafts for an electrical installation or maintenance job. Give the generator the site information a competent reviewer needs.

£14.99/month · all supported documents · cancel anytime

Electrical work in an occupied shop, a new installation and maintenance on existing machinery should not begin from an identical description. The task boundaries, equipment, other users and coordination arrangements change. Your RAMS should make those differences clear.

The £14.99 monthly subscription includes all supported document types for normal use by one business. Prepare a risk assessment and method statement from the same saved job details. Cancel anytime.

Example brief: replacing lighting in an occupied premises

An illustrative job brief identifies the rooms and fittings included, when work is planned, whether other people remain on the premises, the proposed access equipment and who agrees the work area with the customer. It also records which electrical and building information has actually been confirmed.

The example is a description of useful input. It is not an isolation, testing or work-at-height procedure. Those arrangements must be defined and verified by people competent for the actual installation and task. The generator cannot establish them from a short description.

Job detailWhat the draft needs to distinguish
Installation and scopeWhat equipment is included and excluded.
Occupancy and interfacesWho else uses the premises during the work.
Electrical informationWhat is known and what still needs verification.
Tools and accessWhat is actually proposed for this site.
Coordination and permissionsWho confirms the agreed work arrangements.
Checks and handoverWhat the responsible people need to confirm before issue.

Keep the risk assessment and work sequence consistent

The assessment and method statement should describe the same scope, location and revision. A control recorded in the assessment should not conflict with the proposed work sequence. Where a detail is unconfirmed, the draft should leave a clear question for the reviewer rather than assume that permission, isolation or access exists.

HSE’s guidance on work on electrical equipment stresses planning and preparation. Use the source below alongside the information for the actual installation. HazardDocs can organise the paperwork; it cannot check an installation or authorise electrical work.

Installation, maintenance and construction context

Describe the nature of the electrical activity and its relationship with the wider job. Electrical work can arise within different project and workplace arrangements. Calling the job maintenance does not, by itself, establish which responsibilities apply.

Provide the relevant client requirements and available site information. A RAMS pack is a task-level document set; it should not be treated as completing every wider project plan, permit, specialist assessment, inspection or electrical certification requirement.

From job questions to reviewed PDFs

Create the customer and job and select risk assessment and method statement. Add the site, work scope and equipment, then answer the relevant questions. Complete checkout before AI generation.

Check both drafts against the actual arrangements, edit inaccurate assumptions and record the reviewer through Review & approve before issue. If the work changes, return to the saved job, revise the affected information and review the documents again. The review belongs to the people responsible for the work.

Common questions

Does the job pack automatically certify the work?

No. It creates editable document drafts. Competence, site checks, permissions, electrical certification and the suitability of the work arrangements remain separate matters.

Can I prepare electrical maintenance RAMS?

Describe the maintenance task, installation and workplace context in the job brief. The draft must be reviewed for that particular work and should not assume that every maintenance activity has the same requirements.

Can I create only the method statement?

Yes. The monthly subscription includes both document types. Select the document you need and review it before issue.

Sources for the preparation guide

These sources provide context. They do not endorse HazardDocs or approve the example brief.

HazardDocs product and document-preparation guide · Published .

All your safety documents. One simple price.

Complete monthly access

£14.99 / month

No quotes, emails or meetings. Create and review all supported documents for normal business use. VAT included. Cancel anytime.

Get started · £14.99/month

AI-assisted drafts require competent review. Automated bulk generation and resale are excluded.

Find the right starting point