A solar panel cleaning method statement should explain the work that is actually planned. The number of panels is only part of the brief. The position of the array, proposed access, equipment, surrounding activities and customer’s site arrangements all affect what the document needs to describe.
HazardDocs can organise that information into an editable method statement draft. The £14.99/month subscription includes all supported documents for normal use by one business, including a related risk assessment, and select the relevant document types in the builder.
Two arrays, two different starting briefs
For an illustrative ground-mounted array, the brief could identify the site layout, proposed cleaning equipment, movement between rows, water arrangements and other activity in the area. For a roof-mounted array, the brief also needs the actual proposed access and information about the working area.
Neither description establishes that a particular access method is suitable. Do not let a draft assume that a roof can be accessed, a surface can be walked on or equipment can be used without confirmation. State the arrangements that have been assessed and identify information still needed from the client or responsible specialists.
| Input | What to make clear |
|---|---|
| Array and location | Ground-mounted or roof-mounted, with the actual areas included. |
| Proposed access | The method being considered and who confirms its suitability. |
| Cleaning equipment | The real tools, machinery and water arrangements. |
| Site interfaces | Vehicles, occupants, other workers and surrounding operations. |
| Equipment and installation information | Relevant manufacturer and client information available for the work. |
| Unresolved questions | Access, conditions or permissions still awaiting confirmation. |
A work sequence is more than a list of precautions
Describe the intended progression from arrival and coordination to setting up, cleaning, checking the completed work and leaving the site. Connect the sequence with the controls and responsibilities agreed for that job. If different areas require different arrangements, make that distinction visible.
This guide concerns preparing the document. It does not provide an electrical isolation, roof-access, rescue or equipment-operating procedure. Those arrangements must be established for the site by the people responsible before a document can be issued for use.
Access and electrical context need real information
HSE’s work-at-height guidance highlights planning, competence and the condition of the working surface. Its electrical guidance addresses work near electrical hazards. These are relevant sources when identifying the information a reviewer needs; they do not validate a cleaning method for a particular array.
Record the actual proposed access and the site’s electrical and equipment information. Do not infer a safe condition from a panel count, a photograph or the fact that the same array has been cleaned before. Keep uncertainties explicit so the draft can be checked against confirmed arrangements.
Create the draft and keep it with the job
Choose method statement, create the customer and job, then describe the array and work. Answer the relevant follow-up questions and complete checkout before generation. Read the draft carefully, correct assumptions and reconcile it with the job’s risk assessment where one is needed.
Record the competent-person review before downloading the issued PDF. Return to the saved job for a revision, checking any change in access, equipment, conditions or scope. The document records the reviewed work arrangements; it does not replace the checks needed on site.
Common questions
Can I create a complete solar cleaning RAMS pack?
Choose a job pack and select the risk assessment and method statement. Both drafts use the saved job details, but each needs review for the actual array, equipment and site arrangements.
Does the generator choose a safe roof-access method?
No. Provide the proposed method and the confirmed site information. Suitability and the required planning must be assessed by the people responsible for the work.
Are ground-mounted and roof-mounted arrays treated the same?
They need different job information. Describe the actual array and proposed work rather than relying on a generic solar-cleaning label.
Sources for the preparation guide
These sources provide context. They do not endorse HazardDocs or approve the example brief.