Job-specific risk assessment and method statement
Groundworks RAMS generator for excavation and site works
Groundworks paperwork should distinguish the actual excavation, plant, existing services and site conditions, rather than treating every excavation as the same job.
£14.99/ month
VAT included · Cancel anytime · All supported documents for normal business use
AI creates working drafts. A competent person must review actual site conditions and controls before issue. This is not a ready-to-use RAMS for a live job.
Example job brief
Illustrative job: prepare a short drainage trench within a commercial development. Utility information, ground conditions and the proposed excavation arrangements have not yet been confirmed by the responsible team. This is a preparation brief only.
Details to supply in your own document
| Ground and excavation scope | Record location, proposed dimensions, nearby structures and known ground information. |
|---|---|
| Underground services | Record service information, survey status and the responsible competent person. |
| Plant and movement | Identify proposed equipment, delivery routes and interactions with workers. |
| Temporary works | Identify specialist design, support or inspection requirements and unresolved assumptions. |
| Inspection and handover | Record the responsible roles, agreed checks and conditions that trigger review. |
Questions to resolve before approving the drafts
- What service information must be confirmed before work is approved?
- Who determines and verifies the excavation and temporary works arrangements?
- How will nearby loads, structures and other trades be considered?
A draft RAMS does not replace utility surveys, specialist excavation design, temporary works planning or required inspection and authorisation.
How to create the two documents
- Sign in and create the customer and job, choosing the actual work and site.
- Select risk assessment and method statement, answer the relevant follow-up questions and subscribe.
- Generate and edit the drafts. Reconcile the work sequence and risk controls, record competent-person review, and download approved PDFs.
Keep the documents in the job library. Changes to the work need another check and review.
Official guidance for the reviewer
These sources provide guidance, not an endorsement of HazardDocs or approval of the example.
Related safety documents
- Refurbishment risk assessment
- Electrical installation RAMS for occupied buildings
- Roofing RAMS generator for contractors
- Plumbing and heating RAMS generator
- Site-specific risk assessment for occupied refurbishment
- Scaffolding RAMS generator for contractors
- Solar panel installation RAMS generator
- HVAC installation RAMS generator
- Landscaping RAMS generator for grounds maintenance
- Painting and decorating RAMS generator
- Commercial cleaning RAMS for occupied workplaces
- RAMS generator
- All industry and trade guides