Job-specific risk assessment and method statement

Solar panel installation RAMS generator

Installation is different from panel cleaning or routine maintenance. Describe the actual installation scope, roof information, electrical responsibilities and access arrangements.

£14.99/ month

VAT included · Cancel anytime · All supported documents for normal business use

AI creates working drafts. A competent person must review actual site conditions and controls before issue. This is not a ready-to-use RAMS for a live job.

Example job brief

Illustrative job: install a roof-mounted PV array on a commercial building while operations continue below. The roof assessment, lifting arrangements and electrical connection responsibilities need confirmation. The brief is not an installation or isolation procedure.

Details to supply in your own document

Roof and layoutRecord the roof type, array location and available structure and fragility information.
Electrical scopeIdentify the proposed equipment, system interfaces and persons responsible for electrical verification.
Access and materialsRecord agreed access arrangements, delivery and lifting information and separate plans needed.
Operations belowIdentify affected workers, occupants and nearby activities.
Testing and handoverRecord commissioning responsibilities, agreed records and unresolved technical questions.

Questions to resolve before approving the drafts

  • Who confirms roof suitability and the work-at-height arrangements?
  • Which electrical information and authorisations need confirming before approval?
  • Which specialist designs, lifting plans and commissioning records are separate from RAMS?

RAMS cannot verify roof capacity, electrical safety or installation compliance. The competent specialists must determine and check the arrangements, certification and authorisations.

How to create the two documents

  1. Sign in and create the customer and job, choosing the actual work and site.
  2. Select risk assessment and method statement, answer the relevant follow-up questions and subscribe.
  3. Generate and edit the drafts. Reconcile the work sequence and risk controls, record competent-person review, and download approved PDFs.

Keep the documents in the job library. Changes to the work need another check and review.

Official guidance for the reviewer

These sources provide guidance, not an endorsement of HazardDocs or approval of the example.