Job-specific risk assessment and method statement
Electrical installation RAMS for occupied buildings
Replacing or installing electrical equipment while a building stays open? Create a risk assessment and method statement around the actual premises, people, agreed work boundaries and electrical arrangements.
£14.99/ month
VAT included · Cancel anytime · All supported documents for normal business use
AI creates working drafts. A competent person must review actual site conditions and controls before issue. This is not a ready-to-use RAMS for a live job.
Example job brief
Illustrative job: a small contractor is replacing lighting in two rooms of an occupied medical practice. Rooms may be temporarily unavailable; patients and staff continue using adjacent corridors. Existing electrical information and access bookings have not yet been confirmed. This brief is an example of useful input, not an electrical procedure.
Details to supply in your own document
| Work scope | Identify the rooms and fittings included, existing equipment and exclusions. |
|---|---|
| Occupied premises | Record access times, users of adjacent areas and who coordinates with the occupier. |
| Electrical arrangements | Record information supplied by the competent electrical person; identify unconfirmed isolation, verification and testing arrangements. |
| Building information | Confirm whether the planned work may disturb the building fabric and what asbestos information is available. |
| Handover | Identify who confirms the agreed completion and reinstatement checks and when the rooms can return to use. |
Questions to resolve before approving the drafts
- What arrangements has the occupier agreed for the rooms and adjacent access routes?
- Who is responsible for verifying the electrical arrangements for this installation?
- Does the reviewer have sufficient information about the fabric of the building and the agreed work boundary?
The RAMS does not replace electrical certification, safe isolation procedures, asbestos assessments, competent supervision or any required authorisation. Confirm all arrangements with the relevant responsible people before work.
How to create the two documents
- Sign in and create the customer and job, choosing the actual work and site.
- Select risk assessment and method statement, answer the relevant follow-up questions and subscribe.
- Generate and edit the drafts. Reconcile the work sequence and risk controls, record competent-person review, and download approved PDFs.
Keep the documents in the job library. Changes to the work need another check and review.
Official guidance for the reviewer
These sources provide guidance, not an endorsement of HazardDocs or approval of the example.
Related safety documents
- Electrical RAMS for installation and maintenance
- Roofing RAMS generator for contractors
- Plumbing and heating RAMS generator
- Site-specific risk assessment for occupied refurbishment
- Scaffolding RAMS generator for contractors
- Groundworks RAMS generator for excavation and site works
- Solar panel installation RAMS generator
- HVAC installation RAMS generator
- Landscaping RAMS generator for grounds maintenance
- Painting and decorating RAMS generator
- Commercial cleaning RAMS for occupied workplaces
- RAMS generator
- All industry and trade guides